Quantcast
Channel: Microsoft Dynamics SL
Viewing all articles
Browse latest Browse all 14486

Forum Post: RE: Visual Bill of Material/Routing Maintenance - wrong Eff End Date

$
0
0

Use Apply Date-Effective Revisions (11.500.00) to activate or deactivate bills and components based on the corresponding start and stop dates. This process implements all changes scheduled to occur on the date you have entered.

Effective Date specifies the desired system cutoff date for this process. If a bill of material, component, or routing with a pending status has a start date on or before the effective date, then the Apply Date-Effective Revisions (11.500.00) process makes the selected record active. If a bill of material, component, or routing with a status of active has a stop date on or before the effective date, the process makes the selected record obsolete.

Thanks


Viewing all articles
Browse latest Browse all 14486

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>